Emergency Water Source Project for Drought Relief in Jiangxi Province - Water Transfer Project for Suiyang County 2016 Project - Tender Notice for Purchase and Installation of Water Wheel Pump Equipment

Tender code: CBL_20161115_29391117
Bulletin category: Domestic tender

Tenderee: Shuyang County Emergency Water Sources for Drought-Reduction and Water Lift Projects Project Fund Source: Others
1. Bidding conditions The project for tendering for emergency water supply in Jiangxi Province - water abstraction and adjustment project in Xiangyang County has been approved by the higher authorities for construction in 2016. The construction funds are from the central government and provincial and county level facilities. The project has already met the conditions for tendering, and it is now conducting a domestic open tender for the procurement and installation of the turbine pump equipment for the project.
2. Project overview and scope of tender
2.1 Construction site: Zhukeng Town;
2.2 Bid division: a water wheel pump equipment procurement and installation;
2.3 Bidding scope: See details of tender project
2.4 The amount of tender: about 1.91 million yuan
2.5 Planned duration: 120 calendar days, December 15, 2016 to April 13, 2017;
2.6 Quality requirements: Comply with the national quality acceptance and assessment of qualified levels;
3. The bidder qualification requirements (1), with a valid corporate legal person business license;
(2) Having an effective ISO9001 series quality system certification covering the contents of the water wheel pump or water turbine product;
(3) Proposed project manager shall have a professional title above the engineer, and shall be assigned to a field representative (can be the same person as the project leader) with a title of senior technician or engineer. The above personnel shall be the incumbent of the unit and must provide labor contract or social insurance. Proof (The social insurance certificate must be the basic pension insurance enrolled in 2015-2016 from the social security department database, and a continual fee payment certificate for one year and confirmed by the social security department's stamp).
(4) The bidder has had similar water turbine pump or hydro turbine manufacturing performance since January 1, 2010 (according to the time when the contract was signed) (a valid similar performance check must be provided).
(5) The bidder is not being ordered by administrative or disciplinary inspection and supervision authorities at or above the municipal level to order suspension of business and cancellation of bids; the property has not been taken over by the judicial department or administrative law enforcement department, frozen or in bankruptcy; has been executed or is being executed There are no fraudulent acts in the contract and there is no false performance; the contents of the bid documents are true and there is no falsification; and in the past three years, the bidders have not recorded any illegal acts in the bidding activities (a seal of the legal person stamped by the bidder and signature or cover of the legal representative must be issued. If the commitment letter of the above-mentioned content contains the above-mentioned content, the tenderer will confiscate its bid security or performance bond once it is verified that the bidder has recorded more than one bad reputation behavior.
(6) Query results of bribery files issued by the valid bidders unit and project proponent issued by the procuratorial organization at the place where the bidder’s place of domicile or business occurs (the issue time must be after the release date of this announcement, otherwise it is invalid).
The effective similar performance stipulated in the bid evaluation method refers to the turbine pump or turbine equipment that has been successfully operated since the bid opening date; similar performance must provide the original equipment purchase contract and original user certificate, otherwise it is not considered as a valid result.
(7) The bidder has not been ordered to suspend business, cancel or suspend the eligibility status of the water conservancy project in Jiangxi Province.
(8) The bidder must investigate the site on its own, make specific understanding of the installation environment, traffic conditions, etc., and submit the declaration of the surveyed site and the commitment to guarantee the supply to the owner before the deadline for the submission of the bidding documents, if it is in the process of supply and installation. If the terrain or installation environment is not clear enough to result in supply, construction or construction delays, all responsibility will be the responsibility of the successful bidder. As a result of the contract violation, the owner will have the right to deduct the performance bond and release the supply contract.
3.2 The Commonwealth does not accept bids from the Consortium.
4. Qualification Examination Method This tender adopts the qualification system after approval (after the bid evaluation committee review). The bid documents of unqualified bidders will be rejected, and their bid prices will not enter the B value calculation. Please refer to the bidding documents for details. Evaluation method content.
5. Obtaining Bidding Documents Any bidder who meets the eligibility requirements and intends to participate in this tender, please download the bidding documents from November 15, 2016 to November 21, 2016 and import the bidding documents fee into the designated recipients. Account (For details, please refer to the bidding documents for bidding documents, and pay according to the schedule in the bidding documents before). The price of the bidding documents is 10 yuan, and the sales will not be refunded.
6.1 The deadline for submission of bid documents is 9:30 on December 7, 2016.
6.2 The tenderer shall not accept the tender documents delivered late or not delivered to the designated place;

Contact: Zhang Jie

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

USB Docking Station

HDMI Docking Station

Usb Docking Station,Usb Hub Docking Station,Docking Station With Hdmi,Usb C Hub Laptop Docking Station

Shenzhen GuanChen Electronics Co., Ltd. , https://www.gcneotech.com

Posted on